MKM Equipment Container Module is intended for signalling equipment and operating personnel in any environmental conditions 365/7/24. The Module is used in case of a capital building is not available or if it is not reasonable to place equipment in a building.
MKM Equipment Container Module is delivered as a turnkey solution. It is fitted with with main and emergency lighting, fire suppression system, ventilation, air conditioning, heating, access control system, fire and security alarm system.
MKM Equipment Container Module
- Tasks
- Advantages
- Data Sheet
- Video about MKM installation
- Technical Data
- Cost Efficiency
- Geography
- Technical support
MKM Equipment Container Module
MKM Equipment Container Module is intended for signalling equipment and operating personnel in any environmental conditions 365/7/24.
Application
- Allocation of signalling equipment if a capital building is not available.
- Reduction of expenses for construction of building and communications.
- Creation of comfortable work environment for operating staff.
Advantages
- Operation 24/7/365
- Average on-site installation time - 2 hours
- Customized sizes
- Factory-ready solution.
Data Sheet
Video about MKM installation
Technical Data
- Solid housing.
- Ambient operating temperature: -60 to +50 С°.
- Temperature inside the module: +5 to +25 С°.
- Redundant air conditioning N+1.
- Fire extinguishing agent HFC-227еа.
- Highest IP protection in the railway sector.
Cost Efficiency
- Scalable solution
- Reduced costs due to no building and communication construction.
- Lead time: 12-16 weeks.
- Delivered on site in a ready-to-use state.
- Warranty covers the entire facility (MKM and installed signalling equipment).
- 365/24/7 customer support.
Geography of implementation of the MKM system
Technical support
Request call
Call you back soon
Contact Information
Service support:
Bureau of Technical Documentation: